
Residential
Family home, walls up
A four-bedroom house taken from foundation to wall plate in face brick, with the internal walls set out and ready for the roof.

Our projects
Showing 51 of 51 projects.

A four-bedroom house taken from foundation to wall plate in face brick, with the internal walls set out and ready for the roof.

Brickwork and roof structure on a family home, photographed part-way through the build with the site still active.

Handed over. Dark tiled roof, plastered and painted throughout, with the yard cleared and the driveway in.

Bricklaying under way on a suburban stand, with materials staged on site and the site team working.

A residential build in an established suburb, photographed from the air with the surrounding houses for scale.

A contemporary single-storey house completed to finishes, with brick gate piers and a steel driveway gate.

A completed commercial building fitted with a rooftop solar array, photographed during the surrounding groundworks.

A row of townhouses built as one contract — repeated units taken through structure, roof and finishes together.

Face brick walls carried up to wall plate on a residential build, internal walls tied in as the work went.

A new build going up alongside a house the family is still living in — sequenced so the existing home stayed usable throughout.

Foundation walls and floor slab set out, with the internal layout already readable from the air.

A build on open ground outside town — the same standard of coursing and setting-out as any suburban job.

A long perimeter wall in face brick, built with the sand and stone staged along the line of the work.

Room layout set out in brick at slab level. Getting this right is what stops a house being 40mm out by the time the roof goes on.

Block walls carried up with precast lintels stacked on the slab, ready to go in over the openings.

Structural block walls with door and window openings formed as the work went up.

Brick piers carrying a timber roof structure over an open span — photographed from inside before the sheeting went on.

A block structure with cast columns, built on a sloping site.

A large ground slab poured over mesh reinforcement and screeded off level in a single pour.

Trenches dug and footings cast to the plan, with the full footprint of the house readable before a brick was laid.

Plot cleared and materials staged — bricks, sand and stone delivered and set down where the work needs them.

Drilled, cased and equipped — twin tanks on a steel stand with a solar pump, delivering water rather than just a hole.

A borehole being drilled, with casing and rising main staged alongside ready to go down the hole.

The drill string turning, with the return water running off the pad.

The rig set up and levelled on a residential stand, with pipe and materials staged around it.

Storage and a solar pump set up so the borehole keeps delivering without a generator or a ZESA connection.

Tank, stand and the pipework back to the house, plumbed in and commissioned.

Panels fitted for a borehole pump — the part of the job that decides whether the water still runs during load shedding.

A solar water heater lifted onto the roof and mounted on its frame.

Timber trusses set out, braced and levelled across the wall plate, ready for sheeting.

A hipped roof framed out over a brick house on a rural stand.

External plaster and paint taken through to completion, with the parapet and reveals brought up square.

A kitchen fitted out with an island, ceiling and floor finished throughout.

A cast concrete worktop and sink run installed, with tiling and second fix complete.

Timber flooring, staircase and joinery finishes fitted through a double-volume interior.

A two-storey house completed with aluminium window and door systems throughout.

Full-height glazed doors and an off-shutter concrete finish on a contemporary house.

A design visual rather than a photograph — how a two-storey house was presented to the client before anything was built.

A pool finished in blue mosaic tile with formed steps and a full filtration system.

A pool built into an established garden, with the surrounds and steps finished in.

Common bricks palletised and ready for delivery, supplied by the load.

Bricks delivered and stacked where the bricklayers need them, not at the gate.

Cement blocks strapped and palletised, supplied for structural and infill walling.

River and pit sand delivered to site by the load.

Crushed stone and sand supplied for concrete, foundations and hardstanding.

Bricks, sand and stone staged on a cleared plot ahead of the build starting.

A full load of bricks and aggregate delivered onto a rural stand.

Materials delivered onto a bush plot well off the main road.

Tube, angle, flat bar and reinforcing steel held for fabrication and structural work.

Fixings, fittings, tools and the rest of the list, stocked so a site is not held up by a missing box of screws.

Grinders, saws and sanders stocked alongside the materials.
Start your project
We have 51 jobs photographed on this page and many more that were finished before anyone thought to bring a camera. Send us the site location and what you want built.
Free site assessments and quotations, anywhere in Zimbabwe. WhatsApp reaches us fastest.
